




My arsenal for the Job includes an unlimited range of good quality tools and two ex military engineers and of course myself





1) Will i have to remove the oil filter and oil cooler resulting in oil change.

2) Is there any coolant removal involved
3) What are the hardest bolts to get too
4) Which bolt(s) are likely to snap/shear
5) Once the DP is installed do the Heat shields go back on
6) Do i need to move the dipstick out the way
7) The engine had a HG change last year as well as head work a few years back, would the turbo/cat e.t.c have been removed to do this work and will this make the job easier as these components haven't been locked down since the car was born?
8.

9) If i cant remove the cat will the Mongoose zorst im planning to fit bolt to the cat.

10)Whats the worst possible thing that could happen doing this job?

Sorry for all the questions, some may sound a bit stupid but



I must also stress this is for a Rev 1 tubby.


If youve read this far i really appreciate you reading and i hope you can help me out.
